Owner’s engineering · bid advisory · technical due diligence

Solar and battery
storage projects, bid
right, built right and
commissioned right.

SKAPL is the independent advisory practice of Sanjib Kumar. He brings 34 years of heavy electrical projects, nearly a decade running a solar EPC company, and recent tender work on NTPC’s battery storage packages.

◔  WhatsApp +91 63633 00743
Solar array and battery storage illustration
34years in electrical projects, plant operations and renewables
3,500+solar customers served by Swami Integrator, co-founded in 2017
+50%capacity from the Hot Strip Mill upgrade (2.4 to 3.6 MTPA)
6NTPC BESS packages surveyed and estimated, incl. Vallur (300 MWh)

Why now

India is tendering battery
storage faster than it can
build it.

Contracts are being signed at record pace, often by contractors new to storage. Winning on paper is the easy part. The projects still have to be engineered, supplied, connected to the grid and commissioned, and that is where SKAPL works.

130+ GWhof energy storage tendered in India in 2025
~9.2 GWhexpected to be commissioned in 2026
Source: India Energy Storage Alliance, reported by Saur Energy, January 2026.

Services

What SKAPL does

Four services for EPC contractors, project owners and lenders, each delivered personally by a senior engineer rather than handed to a junior team.

Bid & estimation advisory

Tender review and bid/no-bid calls, bills of quantities and cost estimates, vendor-quote evaluation and risk pricing for solar and BESS EPC bids.

You get: Bid risk register, cost model, pre-bid queries

Owner’s engineer & PMC

Design and vendor-document review, factory and site acceptance tests, site supervision, commissioning and performance testing, and O&M readiness.

You get: Review logs, test witness reports, monthly progress reports

Technical due diligence

Independent technical reviews for lenders, investors and acquirers: feasibility, construction monitoring and the health of operating assets.

You get: Due diligence report, risk matrix, monitoring reports

Project recovery

For delayed or under-performing solar and BESS projects: a root-cause review, a recovery plan and a new baseline agreed with the contractor.

You get: Diagnosis within two weeks, recovery plan, weekly tracking

How to engage

Start small, then scale

Begin with a fixed-price health check, then move to a retainer once the value is clear.

Track record

34 years of projects that had to work

NTPC Lot-2 BESS tender

Site surveys, due diligence and cost estimates for six thermal-station packages, including NTECL Vallur (300 MWh), for an EPC bidder.

Swami Integrator & Consultants LLP

Co-founded a Surat solar EPC company and grew it to 3,500+ customers, including NTPC, ISRO, NDDB, Amul and three DISCOMs.

Utility-scale solar and industrial PMC

PMC and site supervision at Mandsaur and Charanka Solar Park; PMC for a 5.5 MW co-generation plant at Vapi.

Essar Steel: General Manager

Head of Electrical & Automation for the CSP mill, leading a team of 60; ISO 9001, ISO 14001 and OHSAS 18001.

Essar Steel: greenfield CSP mill

Electrical & automation project in-charge with SMS Demag, ABB and Siemens; commissioned and stabilised in record time.

Essar Steel: Hot Strip Mill upgrade

Led the upgrade from 2.4 to 3.6 MTPA (+50%), commissioned well ahead of schedule.

NTPCISRONDDBAmulSumulIDMCGIZDGVCLMGVCLDNHPDCLEssar Steel
Organisations Sanjib has delivered projects for at Swami Integrator & Consultants LLP and Essar Steel.
Sanjib Kumar, founder and principal consultant of SKAPL

Founder

Sanjib Kumar

Founder & Principal Consultant

Sanjib spent 23 years at Essar Steel’s Hazira works, rising from Graduate Engineer Trainee to General Manager and Head of Electrical & Automation for the Compact Strip Production mill. He led the Hot Strip Mill upgrade from 2.4 to 3.6 MTPA and built the electrical and automation systems of a greenfield mill with SMS Demag, ABB and Siemens.

In 2017 he co-founded Swami Integrator & Consultants LLP, a Surat solar EPC company that grew to more than 3,500 customers. Today he advises contractors, owners and lenders on solar and battery storage, from Bengaluru and Surat, and travels wherever the project is. He is also a qualified independent director, registered in the Ministry of Corporate Affairs’ Independent Directors’ Databank.

Most project delays are decided early: in the bid, in the vendor documents and in the commissioning plan.
  • B.E. (Electronics), SVNIT Surat
  • PG Diploma in Business Finance, ICFAI
  • Independent Director’s Certification Programme, IIM Bangalore
  • Independent Director proficiency test qualified, IICA (Ministry of Corporate Affairs), 2025
  • Faculty, Art of Living corporate programmes, since 2008

Insights

Field notes on solar and storage

Contact

Tell me about your
project

Bidding for a BESS or solar tender, starting construction, or worried about a project that’s slipping? A 30-minute call is usually enough to see where the risks are.

✉  sanjib@theskapl.com◔  +91 63633 00743 (phone and WhatsApp)⌖  Bengaluru and Surat. Site assignments across India and overseas.▣  linkedin.com/in/kumarsanjib

Send a message